Speculative Practice · RMIT APP3 · Semester 1, 2025
VoidCraft
VoidCraft is a Melbourne-based architectural consultancy dedicated to transforming how cities are planned, designed, and evaluated through digital twin technology. The service connects traditional architectural design to data-driven urban simulation, offering an immersive, interactive, and analytical platform that lets clients test design ideas, visualise urban impacts, and engage stakeholders before a single brick is laid.
The proposition is a simultaneous macro and micro digital twin: a city-scale model of Greater Melbourne combined with project-specific modelling for individual developments. The twin can run traffic flow, wind, sun and shadow, flood resilience, pedestrian movement, and zoning impact scenarios in real time. Neither purely a city simulation nor a single-purpose engineering study: both at once.
A hypothetical practice developed as part of RMIT's Architecture Professional Practice 3 course. Three M.Arch graduates propose a partnership registered in Victoria, built on a technology stack of NVIDIA Omniverse, ArcGIS CityEngine, SimScale, Unreal Engine, Rhino, Revit, and Bentley iTwin.
Service Output: Digital Twin
Wind Simulation: Melbourne CBD
Real-Time Design Feedback for Architects
Climate + Flood Risk Simulation
Urban Zoning + Planning Scenarios
Operations
Production
Software suite includes Revit, Rhino, ArcGIS CityEngine, SimScale, NVIDIA Omniverse, and Unreal Engine. Data is sourced from clients, open datasets, and city agencies. Workstations, cloud rendering, and VR rigs support in-house processing.
Digital Technology
Design Services + Workflow
Assets
Cost + Time Efficiency
VoidCraft vs In-House: cumulative cost over 6 months. Service-based model saves $200K+ in salaries, licenses, and infrastructure.
Competitor Identification
Market Research
The market for digital twins in architecture and urban planning is rapidly growing. Governments worldwide are funding smart city platforms (e.g. Singapore's Virtual Singapore, Australia's $37.4M Digital Twin Victoria), signalling strong demand. Regulators are beginning to expect digital twin strategies in major projects. Despite this momentum, uptake in traditional practice remains limited, leaving a gap for VoidCraft.
SWOT Analysis
Key People
Shahriyar Ahmad
Co-founder / Principal Consultant. M.Arch RMIT. Digital twin expertise, ex-ADS + Indigenous Architects.
Nicole Markis
Co-founder (Project Development + Stakeholder Management). M.Arch RMIT, A.Dip Building Design (RMIT).
Gharaza Kaleem
Co-founder (Urban Strategy + Visual Communications). M.Arch RMIT.
Sources of Advice + Support
Goals + Actions
Goals for Next Year
Goals for Next 3 Years
Typical Project Timeline
Single project Gantt chart with milestones and payment schedule